ITAC Assessment: UD0654
ITAC logo
ITAC Assessment: UD0654
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Pont of purchase display cabinetry
NAICS
n/a
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 96,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,941 1,391,780
kWh
Electricity Demand $25,416 4,236
kW-mo/yr
Natural Gas $8,641 1,256
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,195 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,627

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $12,000 $12,000 - - $12,000 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,416 $5,925 $840
24,000
kWh
$576
-
kW-mo/yr
- -
03 3.1191: Change procedures / equipment / operating conditions $1,152 $2,800 - - - $1,152
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,212 - $1,488
42,500
kWh
$1,224
-
kW-mo/yr
$(-1,500.0) -
05 2.4231: Reduce the pressure of compressed air to the minimum required $415 $200 $228
6,500
kWh
$187
-
kW-mo/yr
- -
TOTAL RECOMMENDED $16,195 $20,925 $2,556
73,000
kWh
$1,987
-
kW-mo/yr
$10,500 $1,152
TOTAL IMPLEMENTED $1,627 $200 $1,716
49,000
kWh
$1,411
-
kW-mo/yr
$(-1,500.0) -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs