ITAC Assessment: OR0661
ITAC logo
ITAC Assessment: OR0661
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Smoked Seafood
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 95,000
ft2
Annual Production 6,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,434 3,107,161
kWh
Electricity Demand $22,269 5,392
kW-mo/yr
Electricity Fees $75,132 -
Natural Gas $185,245 17,851
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $143,235 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,240

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $52,251 $18,807 $3,136
45,765
kWh
- - $49,115
02 2.2622: Replace existing chiller with high efficiency model $76,637 $205,256 $69,345
1,012,047
kWh
$7,292
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $1,989 $170 - - $1,989
-
MMBtu
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $10,575 $3,600 $10,575
154,339
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,783 $2,340 $1,783
26,028
kWh
- - -
TOTAL RECOMMENDED $143,235 $230,173 $84,839
1,238,179
kWh
$7,292
-
kW-mo/yr
$1,989
-
MMBtu
$49,115
TOTAL IMPLEMENTED $54,240 $18,977 $3,136
45,765
kWh
- $1,989
-
MMBtu
$49,115
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs