| Assessment Year | 2016 |
|---|---|
| Principal Product | Plastic Containers |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
96,000
ft2
|
| Annual Production | 40,000,000
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $192,640 | 4,676,630 |
kWh
|
$0.041 |
| Electricity Demand | $94,920 | 12,656 |
kW-mo/yr
|
$7.50 |
| Electricity Fees | $1,200 | - |
|
- |
| Natural Gas | $839 | 27 |
MMBtu
|
$31.07 |
| TOTAL YEARLY COSTS | $289,599 | |||
| RECOMMENDED SAVINGS* | $268,278 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,581 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.652: Replace existing equipment with more suitable substitutes | $157,793 | $301,613 |
$1,825
44,306
kWh
|
$1,370
-
kW-mo/yr
|
- | - | $154,598 | |
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $102,571 | $10,390 |
$20,162
489,494
kWh
|
- | - | - | $82,409 | |
| 03 | 2.2511: Insulate bare equipment | $4,333 | $229 |
$4,333
105,185
kWh
|
- | - | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,117 | $5,344 |
$1,690
41,034
kWh
|
$592
-
kW-mo/yr
|
$482 | $(-647.0) | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,464 | - |
$1,082
26,279
kWh
|
$382
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $268,278 | $317,576 |
$29,092
706,298
kWh
|
$2,344
-
kW-mo/yr
|
$482 | $(-647.0) | $237,007 | ||
| TOTAL IMPLEMENTED | $3,581 | $5,344 |
$2,772
67,313
kWh
|
$974
-
kW-mo/yr
|
$482 | $(-647.0) | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs