ITAC Assessment: OR0673
ITAC logo
ITAC Assessment: OR0673
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Plastic Containers
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 96,000
ft2
Annual Production 40,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,640 4,676,630
kWh
Electricity Demand $94,920 12,656
kW-mo/yr
Electricity Fees $1,200 -
Natural Gas $839 27
MMBtu
TOTAL YEARLY COSTS $289,599
RECOMMENDED SAVINGS* $268,278 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,581

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 4.652: Replace existing equipment with more suitable substitutes $157,793 $301,613 $1,825
44,306
kWh
$1,370
-
kW-mo/yr
- - $154,598
02 2.2414: Use waste heat from hot flue gases to preheat $102,571 $10,390 $20,162
489,494
kWh
- - - $82,409
03 2.2511: Insulate bare equipment $4,333 $229 $4,333
105,185
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,117 $5,344 $1,690
41,034
kWh
$592
-
kW-mo/yr
$482 $(-647.0) -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,464 - $1,082
26,279
kWh
$382
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $268,278 $317,576 $29,092
706,298
kWh
$2,344
-
kW-mo/yr
$482 $(-647.0) $237,007
TOTAL IMPLEMENTED $3,581 $5,344 $2,772
67,313
kWh
$974
-
kW-mo/yr
$482 $(-647.0) -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs