Assessment Year | 2016 |
---|---|
Principal Product | Plastic Containers |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
96,000
ft2
|
Annual Production | 40,000,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $192,640 | 4,676,630 |
kWh
|
$0.041 |
Electricity Demand | $94,920 | 12,656 |
kW-mo/yr
|
$7.50 |
Electricity Fees | $1,200 | - |
|
- |
Natural Gas | $839 | 27 |
MMBtu
|
$31.07 |
TOTAL YEARLY COSTS | $289,599 | |||
RECOMMENDED SAVINGS* | $268,278 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,581 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.652: Replace existing equipment with more suitable substitutes | $157,793 | $301,613 |
$1,825
44,306
kWh
|
$1,370
-
kW-mo/yr
|
- | - | $154,598 | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $102,571 | $10,390 |
$20,162
489,494
kWh
|
- | - | - | $82,409 | |
03 | 2.2511: Insulate bare equipment | $4,333 | $229 |
$4,333
105,185
kWh
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,117 | $5,344 |
$1,690
41,034
kWh
|
$592
-
kW-mo/yr
|
$482 | $(-647.0) | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,464 | - |
$1,082
26,279
kWh
|
$382
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $268,278 | $317,576 |
$29,092
706,298
kWh
|
$2,344
-
kW-mo/yr
|
$482 | $(-647.0) | $237,007 | ||
TOTAL IMPLEMENTED | $3,581 | $5,344 |
$2,772
67,313
kWh
|
$974
-
kW-mo/yr
|
$482 | $(-647.0) | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs