ITAC Assessment: UU0255
ITAC logo
ITAC Assessment: UU0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Vitamins and supplements
NAICS 325411: Medicinal and Botanical Manufacturing
SIC 2833: Medicinal Chemicals and Botanical Products
Sales Range $10
M
to 50
M
# of Employees 181
Plant Area 175,000
ft2
Annual Production 30,000,000
units
Production Hrs. Annual 4,420
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,103 4,850,760
kWh
Electricity Demand $120,818 11,506
kW-mo/yr
Electricity Fees $18,638 -
Natural Gas $243,318 21,261
MMBtu
TOTAL YEARLY COSTS $538,876
RECOMMENDED SAVINGS* $99,033 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8113: Purchase gas directly from a contract gas supplier $64,548 $8,000 - - - $64,548
02 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $5,674 $8,711 - - $5,674
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,299 $2,614 - - $2,299
-
MMBtu
-
04 2.2515: Use optimum thickness insulation $10,948 $4,085 - - $10,948
-
MMBtu
-
05 2.7135: Install occupancy sensors $1,750 $4,964 $926
28,900
kWh
$824
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,033 $8,000 $1,327
41,132
kWh
$706
-
kW-mo/yr
- -
07 2.6218: Turn off equipment when not in use $4,849 $4,680 $4,849
150,586
kWh
- - -
08 2.4226: Use / purchase optimum sized compressor $6,932 $60,862 $4,513
140,255
kWh
$2,419
-
kW-mo/yr
- -
TOTAL RECOMMENDED $99,033 $101,916 $11,615
360,873
kWh
$3,949
-
kW-mo/yr
$18,921
-
MMBtu
$64,548
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs