ITAC Assessment: TN0220
ITAC logo
ITAC Assessment: TN0220
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product CONVEYOR BELTING
NAICS
n/a
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 100,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $860,070 20,196,952
kWh
Natural Gas $110,553 20,174
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,251 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,971

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $16,500 $29,700 - $16,500
-
MMBtu
02 2.2511: Insulate bare equipment $35,035 $750 $35,035
814,771
kWh
-
03 2.2515: Use optimum thickness insulation $23,700 $4,570 $23,700
550,996
kWh
-
04 2.6232: Install set-back timers $18,780 - $18,780
436,694
kWh
-
05 2.2511: Insulate bare equipment $6,330 $400 $6,330
147,128
kWh
-
06 2.2511: Insulate bare equipment $680 $250 $680
15,826
kWh
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $226 - - $226
-
MMBtu
TOTAL RECOMMENDED $101,251 $35,670 $84,525
1,965,415
kWh
$16,726
-
MMBtu
TOTAL IMPLEMENTED $65,971 $5,970 $65,745
1,528,721
kWh
$226
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs