ITAC Assessment: OR0660
ITAC logo
ITAC Assessment: OR0660
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Frozen Fish
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 45,000
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 8,750
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,353 586,040
kWh
Electricity Demand $13,385 2,098
kW-mo/yr
Natural Gas $13,661 1,361
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $147,835 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $139,593

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Product Savings
01 3.1191: Change procedures / equipment / operating conditions $135,000 $250,000 - - - $135,000
02 2.7135: Install occupancy sensors $3,310 $8,500 $2,344
24,751
kWh
$80
-
kW-mo/yr
$886 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,283 $1,500 $1,283
13,547
kWh
- - -
04 2.9114: Use solar heat to make electricty $8,242 $54,525 $8,182
86,394
kWh
$60
-
kW-mo/yr
- -
TOTAL RECOMMENDED $147,835 $314,525 $11,809
124,692
kWh
$140
-
kW-mo/yr
$886 $135,000
TOTAL IMPLEMENTED $139,593 $260,000 $3,627
38,298
kWh
$80
-
kW-mo/yr
$886 $135,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs