ITAC Assessment: OR0674
ITAC logo
ITAC Assessment: OR0674
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Printing
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $1
M
to 5
M
# of Employees 230
Plant Area 350,000
ft2
Annual Production 280,000,000
units
Production Hrs. Annual 7,300
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $758,425 12,491,504
kWh
Electricity Demand $195,360 52,800
kW-mo/yr
Electricity Fees $438,587 -
Natural Gas $162,656 30,844
MMBtu
TOTAL YEARLY COSTS $1,555,028
RECOMMENDED SAVINGS* $15,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,329

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $5,868 - $5,868
73,117
kWh
- - -
02 2.2414: Use waste heat from hot flue gases to preheat $5,376 $4,258 - - $5,376
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,953 - $4,023
60,129
kWh
$395
-
kW-mo/yr
- $(-465.0)
TOTAL RECOMMENDED $15,197 $4,258 $9,891
133,246
kWh
$395
-
kW-mo/yr
$5,376
-
MMBtu
$(-465.0)
TOTAL IMPLEMENTED $9,329 $4,258 $4,023
60,129
kWh
$395
-
kW-mo/yr
$5,376
-
MMBtu
$(-465.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs