ITAC Assessment: SD0241
ITAC logo
ITAC Assessment: SD0241
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Men's suits
NAICS
n/a
SIC 2311: Men's and Boys' Suits, Coats, and Overcoats
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area 265,000
ft2
Annual Production 115,000
pieces
Production Hrs. Annual 2,688
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,251 1,930,832
kWh
Electricity Demand $90,990 7,357
kW-mo/yr
Electricity Fees $2,088 -
Natural Gas $85,825 17,758
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,514 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,853

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.1221: Replace obsolete burners with more efficient ones $9,946 $24,320 - - $9,946
-
MMBtu
- -
02 2.7135: Install occupancy sensors $9,310 $840 $4,585
78,839
kWh
$4,725
-
kW-mo/yr
- - -
03 2.1241: Reduce excessive boiler blowdown $2,831 $6,150 - - $2,831
-
MMBtu
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,802 - $1,764
30,188
kWh
$1,038
-
kW-mo/yr
- - -
05 2.7111: Reduce illumination to minimum necessary levels $1,851 $240 $960
16,413
kWh
$891
-
kW-mo/yr
- - -
06 2.6212: Turn off equipment during breaks, reduce operating time $274 - $135
2,345
kWh
$139
-
kW-mo/yr
- - -
07 4.112: Replace old machine with new automatic multi-station tool $31,500 $20,000 - - - $31,500 -
08 4.122: Develop standard procedures to improve internal yields $4,000 $500 - - - - $4,000
TOTAL RECOMMENDED $62,514 $52,050 $7,444
127,785
kWh
$6,793
-
kW-mo/yr
$12,777
-
MMBtu
$31,500 $4,000
TOTAL IMPLEMENTED $15,853 $30,470 $1,899
32,533
kWh
$1,177
-
kW-mo/yr
$12,777
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs