| Assessment Year | 2000 |
|---|---|
| Principal Product | Men's suits |
| NAICS |
n/a
|
| SIC | 2311: Men's and Boys' Suits, Coats, and Overcoats |
| Sales Range | $10 M to 50M |
| # of Employees | 450 |
| Plant Area |
265,000
ft2
|
| Annual Production | 115,000
pieces
|
| Production Hrs. Annual | 2,688
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $112,251 | 1,930,832 |
kWh
|
$0.058 |
| Electricity Demand | $90,990 | 7,357 |
kW-mo/yr
|
$12.37 |
| Electricity Fees | $2,088 | - |
|
- |
| Natural Gas | $85,825 | 17,758 |
MMBtu
|
$4.83 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $62,514 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,853 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1221: Replace obsolete burners with more efficient ones | $9,946 | $24,320 | - | - |
$9,946
-
MMBtu
|
- | - | |
| 02 | 2.7135: Install occupancy sensors | $9,310 | $840 |
$4,585
78,839
kWh
|
$4,725
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.1241: Reduce excessive boiler blowdown | $2,831 | $6,150 | - | - |
$2,831
-
MMBtu
|
- | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,802 | - |
$1,764
30,188
kWh
|
$1,038
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $1,851 | $240 |
$960
16,413
kWh
|
$891
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $274 | - |
$135
2,345
kWh
|
$139
-
kW-mo/yr
|
- | - | - | |
| 07 | 4.112: Replace old machine with new automatic multi-station tool | $31,500 | $20,000 | - | - | - | $31,500 | - | |
| 08 | 4.122: Develop standard procedures to improve internal yields | $4,000 | $500 | - | - | - | - | $4,000 | |
| TOTAL RECOMMENDED | $62,514 | $52,050 |
$7,444
127,785
kWh
|
$6,793
-
kW-mo/yr
|
$12,777
-
MMBtu
|
$31,500 | $4,000 | ||
| TOTAL IMPLEMENTED | $15,853 | $30,470 |
$1,899
32,533
kWh
|
$1,177
-
kW-mo/yr
|
$12,777
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs