ITAC Assessment: KU0186
ITAC logo
ITAC Assessment: KU0186
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product ADHESIVES,SEALANTS
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 6,000,000
lb
Production Hrs. Annual 7,020
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,660 1,080,012
kWh
Natural Gas $11,596 2,551
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,064

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $8,265 $1,500 $10,986
145,369
kWh
$(-2,721.0)
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,272 $980 $5,272
69,754
kWh
- -
03 2.7261: Install timers and/or thermostats $4,780 $800 $576
7,620
kWh
$4,204
-
MMBtu
-
04 2.2511: Insulate bare equipment $1,657 $1,500 $1,816
24,033
kWh
$(-159.0)
-
MMBtu
-
05 2.1123: Install automatic stack damper $896 $725 - $896
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $360 - - $560
-
MMBtu
$(-200.0)
07 2.6121: Reduce hot water temperature to the minimum required $406 - $288
3,810
kWh
$118
-
MMBtu
-
08 2.7444: Close holes and openings in building such as broken windows $396 $385 - $396
-
MMBtu
-
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $215 $400 $288
3,810
kWh
$(-73.0)
-
MMBtu
-
10 2.2211: Use optimum temperature $205 - - $205
-
MMBtu
-
11 2.2511: Insulate bare equipment $187 $172 - $187
-
MMBtu
-
12 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $177 $30 $177
2,345
kWh
- -
TOTAL RECOMMENDED $22,816 $6,492 $19,403
256,741
kWh
$3,613
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED $9,064 $3,612 $2,857
37,808
kWh
$6,407
-
MMBtu
$(-200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs