Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

417

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other animal food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0105 #01 Y:2013 Repair and eliminate steam leaks $6,636 $3,420
DL0111 #07 Y:2013 Optimize plant power factor $20,400 $25,000
DL0111 #06 Y:2013 Reduce the pressure of compressed air to the minimum required $930 $50
DL0111 #05 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $6,667 $13,600
DL0111 #04 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $41,668 $25,000
DL0111 #03 Y:2013 Lower light fixtures in high ceiling areas $8,423 $45,640
DL0111 #02 Y:2013 Establish equipment maintenance schedule $5,281 $1,500
DL0111 #01 Y:2013 Analyze flue gas for proper air/fuel ratio $9,454 $17,500
OK0857 #01 Y:2013 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $46,232 $492,750
MS0391 #02 Y:2012 Utilize higher efficiency lamps and/or ballasts $360 $1,800
MS0391 #01 Y:2012 Repair and eliminate steam leaks $15,275 $606
IA0471 #06 Y:2011 Utilize a less expensive cooling method $1,974 $1,500
IA0471 #05 Y:2011 Use heat from boiler blowdown to preheat boiler feed water $465 $3,000
IA0471 #04 Y:2011 Upgrade controls on compressors $2,430 $3,832
IA0471 #03 Y:2011 Install / repair insulation on steam lines $1,799 $227
IA0471 #02 Y:2011 Install occupancy sensors $979 $1,463
IA0471 #01 Y:2011 Utilize higher efficiency lamps and/or ballasts $262 $250
OK0803 #07 Y:2010 Use most efficient type of electric motors $4,821 $18,906
OK0803 #06 Y:2010 Install / repair insulation on steam lines $2,896 $1,465
OK0803 #05 Y:2010 Install compressor air intakes in coolest locations $208 $300