ITAC Assessment: DL0111
ITAC logo
ITAC Assessment: DL0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product poultry feed
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 100,000
ft2
Annual Production 312,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $323,466 4,989,600
kWh
Electricity Demand $140,764 15,728
kW-mo/yr
Electricity Fees $19,916 -
Natural Gas $351,883 43,175
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,823 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,611

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $9,454 $17,500 - - $9,454
-
MMBtu
02 2.6124: Establish equipment maintenance schedule $5,281 $1,500 - - $5,281
-
MMBtu
03 2.7141: Lower light fixtures in high ceiling areas $8,423 $45,640 $8,423
90,574
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $41,668 $25,000 $41,668
447,947
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,667 $13,600 $6,667
71,688
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $930 $50 $930
9,930
kWh
- -
07 2.3212: Optimize plant power factor $20,400 $25,000 - $20,400
-
kW-mo/yr
-
TOTAL RECOMMENDED $92,823 $128,290 $57,688
620,139
kWh
$20,400
-
kW-mo/yr
$14,735
-
MMBtu
TOTAL IMPLEMENTED $26,611 $26,550 $930
9,930
kWh
$20,400
-
kW-mo/yr
$5,281
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs