ITAC Assessment: SD0563
ITAC logo
ITAC Assessment: SD0563
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Dental Brackets
NAICS 339114: Dental Equipment and Supplies Manufacturing
SIC 3843: Dental Equipment and Supplies
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 64,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 4,680
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,732 1,698,342
kWh
Electricity Demand $157,225 4,372
kW-mo/yr
TOTAL YEARLY COSTS $332,957
RECOMMENDED SAVINGS* $39,376 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,571

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.3132: Recharge batteries on during off-peak demand periods $22,261 $80,415 $(-1,180.0)
(-11,509)
kWh
$23,441
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,544 $27,042 $4,759
46,380
kWh
$4,682
-
kW-mo/yr
$103
03 2.4133: Use most efficient type of electric motors $4,919 $2,796 $2,800
27,290
kWh
$2,119
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,076 $1,500 $1,076
10,483
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $956 $2,850 $503
4,914
kWh
$453
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $620 $600 $620
6,051
kWh
- -
TOTAL RECOMMENDED $39,376 $115,203 $8,578
83,609
kWh
$30,695
-
kW-mo/yr
$103
TOTAL IMPLEMENTED $7,571 $7,746 $4,999
48,738
kWh
$2,572
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs