Assessment Year | 2018 |
---|---|
Principal Product | Dental Brackets |
NAICS | 339114: Dental Equipment and Supplies Manufacturing |
SIC | 3843: Dental Equipment and Supplies |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
64,000
ft2
|
Annual Production | 500,000
units
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $175,732 | 1,698,342 |
kWh
|
$0.10 |
Electricity Demand | $157,225 | 4,372 |
kW-mo/yr
|
$35.96 |
TOTAL YEARLY COSTS | $332,957 | |||
RECOMMENDED SAVINGS* | $39,376 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,571 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.3132: Recharge batteries on during off-peak demand periods | $22,261 | $80,415 |
$(-1,180.0)
(-11,509)
kWh
|
$23,441
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,544 | $27,042 |
$4,759
46,380
kWh
|
$4,682
-
kW-mo/yr
|
$103 | |
03 | 2.4133: Use most efficient type of electric motors | $4,919 | $2,796 |
$2,800
27,290
kWh
|
$2,119
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,076 | $1,500 |
$1,076
10,483
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $956 | $2,850 |
$503
4,914
kWh
|
$453
-
kW-mo/yr
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $620 | $600 |
$620
6,051
kWh
|
- | - | |
TOTAL RECOMMENDED | $39,376 | $115,203 |
$8,578
83,609
kWh
|
$30,695
-
kW-mo/yr
|
$103 | ||
TOTAL IMPLEMENTED | $7,571 | $7,746 |
$4,999
48,738
kWh
|
$2,572
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs