ITAC Assessment: HO0050
ITAC logo
ITAC Assessment: HO0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Mechanical Control Systems
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area 45,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,281 397,714
kWh
LPG $4,785 407
MMBtu
Fuel Oil #2 $17,040 2,618
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,541 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,541

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,748 $2,605 $6,748
47,479
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,764 $3,483 $1,764
12,603
kWh
-
03 2.4133: Use most efficient type of electric motors $319 $285 $319
2,345
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $809 $300 $809
5,569
kWh
-
05 2.2136: Install / repair insulation on steam lines $67 $204 - $67
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $834 $40 $834
5,862
kWh
-
TOTAL RECOMMENDED $10,541 $6,917 $10,474
73,858
kWh
$67
-
MMBtu
TOTAL IMPLEMENTED $10,541 $6,917 $10,474
73,858
kWh
$67
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs