Assessment Year | 2009 |
---|---|
Principal Product | Tofu |
NAICS | 311224: Soybean and Other Oilseed Processing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 161 |
Plant Area |
115,000
ft2
|
Annual Production | 2,860,000
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $973,807 | 7,442,000 |
kWh
|
$0.13 |
Electricity Demand | $79,416 | 15,970 |
kW-mo/yr
|
$4.97 |
Electricity Fees | $840 | - |
|
- |
Natural Gas | $898,878 | 66,205 |
MMBtu
|
$13.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $298,075 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $56,256 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $239,800 | $170,000 |
$(-4,538.0)
(-34,913)
kWh
|
- |
$244,338
-
MMBtu
|
|
02 | 2.5125: Size air handling grills/ duct/s coils to minimize air resistance | $43,089 | $6,000 |
$39,242
301,860
kWh
|
$3,847
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,728 | $18,400 |
$6,728
51,754
kWh
|
- | - | |
04 | 2.3212: Optimize plant power factor | $6,439 | $12,500 | - |
$6,439
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,019 | $3,800 |
$2,019
15,532
kWh
|
- | - | |
TOTAL RECOMMENDED | $298,075 | $210,700 |
$43,451
334,233
kWh
|
$10,286
-
kW-mo/yr
|
$244,338
-
MMBtu
|
||
TOTAL IMPLEMENTED | $56,256 | $36,900 |
$45,970
353,614
kWh
|
$10,286
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs