ITAC Assessment: MA0643
ITAC logo
ITAC Assessment: MA0643
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Tofu
NAICS 311224: Soybean and Other Oilseed Processing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 161
Plant Area 115,000
ft2
Annual Production 2,860,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $973,807 7,442,000
kWh
Electricity Demand $79,416 15,970
kW-mo/yr
Electricity Fees $840 -
Natural Gas $898,878 66,205
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $298,075 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,256

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $239,800 $170,000 $(-4,538.0)
(-34,913)
kWh
- $244,338
-
MMBtu
02 2.5125: Size air handling grills/ duct/s coils to minimize air resistance $43,089 $6,000 $39,242
301,860
kWh
$3,847
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,728 $18,400 $6,728
51,754
kWh
- -
04 2.3212: Optimize plant power factor $6,439 $12,500 - $6,439
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,019 $3,800 $2,019
15,532
kWh
- -
TOTAL RECOMMENDED $298,075 $210,700 $43,451
334,233
kWh
$10,286
-
kW-mo/yr
$244,338
-
MMBtu
TOTAL IMPLEMENTED $56,256 $36,900 $45,970
353,614
kWh
$10,286
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs