ITAC Assessment: OK0803
ITAC logo
ITAC Assessment: OK0803
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Cattle feed
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 63,000
ft2
Annual Production 75,000
ton
Production Hrs. Annual 5,070
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $232,780 2,935,600
kWh
Electricity Demand $29,655 13,180
kW-mo/yr
Natural Gas $17,409 3,087
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,053 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,611

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $17,686 $22,080 $17,686
198,719
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,156 $13,723 $2,156
24,224
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $74 $524 $74
832
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,212 $2,024 $1,212
13,916
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $208 $300 $208
2,335
kWh
-
06 2.2136: Install / repair insulation on steam lines $2,896 $1,465 - $2,896
-
MMBtu
07 2.4133: Use most efficient type of electric motors $4,821 $18,906 $4,821
54,169
kWh
-
TOTAL RECOMMENDED $29,053 $59,022 $26,157
294,195
kWh
$2,896
-
MMBtu
TOTAL IMPLEMENTED $25,611 $42,751 $22,715
255,223
kWh
$2,896
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs