| Assessment Year | 2013 |
|---|---|
| Principal Product | Livestock Feed |
| NAICS | 311119: Other Animal Food Manufacturing |
| SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
| Sales Range | $10 M to 50M |
| # of Employees | 26 |
| Plant Area |
25,000
ft2
|
| Annual Production | 40,000
ton
|
| Production Hrs. Annual | 5,784
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $301,366 | 3,706,716 |
kWh
|
$0.081 |
| Electricity Fees | $18,159 | - |
|
- |
| Natural Gas | $197,865 | 54,085 |
MMBtu
|
$3.66 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,745 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,625 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2135: Repair and eliminate steam leaks | $6,636 | $3,420 | - | - |
$6,636
-
MMBtu
|
|
| 02 | 2.2136: Install / repair insulation on steam lines | $564 | $426 | - | - |
$564
-
MMBtu
|
|
| 03 | 2.7261: Install timers and/or thermostats | $4,409 | $510 |
$4,168
51,272
kWh
|
$241 | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,220 | $4,669 |
$3,044
37,440
kWh
|
$176 | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $347 | $1,056 |
$328
4,035
kWh
|
$19 | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,711 | $1,600 |
$2,563
31,524
kWh
|
$148 | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,669 | $1,900 |
$1,578
19,405
kWh
|
$91 | - | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,189 | $596 |
$1,124
13,826
kWh
|
$65 | - | |
| TOTAL RECOMMENDED | $20,745 | $14,177 |
$12,805
157,502
kWh
|
$740 |
$7,200
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $13,625 | $12,067 |
$6,074
74,706
kWh
|
$351 |
$7,200
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs