ITAC Assessment: GT0865
ITAC logo
ITAC Assessment: GT0865
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Rubber Automotive Parts
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 250,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $817,603 10,571,135
kWh
Natural Gas $37,793 2,180
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $154,453 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,706

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $23,450 - $4,250
24,870
kWh
$19,200 -
02 2.5123: Reduce fluid flow rates $3,226 $1,220 $3,226
37,730
kWh
- -
03 2.7313: Recycle air for heating, ventilation and air conditioning $5,697 $1,100 $462
5,407
kWh
- $5,235
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $1,003 $1,920 $1,003
11,730
kWh
- -
05 2.7231: Use radiant heater for spot heating $5,208 $8,000 - - $5,208
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $40,450 $84,450 $40,450
473,100
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,256 $15,290 $6,256
73,200
kWh
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $69,163 $135,000 $69,163
808,920
kWh
- -
TOTAL RECOMMENDED $154,453 $246,980 $124,810
1,434,957
kWh
$19,200 $10,443
-
MMBtu
TOTAL IMPLEMENTED $46,706 $99,740 $46,706
546,300
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs