| Assessment Year | 2009 |
|---|---|
| Principal Product | Rubber Automotive Parts |
| NAICS | 326299: All Other Rubber Product Manufacturing |
| SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
100,000
ft2
|
| Annual Production | 250,000,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $817,603 | 10,571,135 |
kWh
|
$0.077 |
| Natural Gas | $37,793 | 2,180 |
MMBtu
|
$17.34 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $154,453 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $46,706 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $23,450 | - |
$4,250
24,870
kWh
|
$19,200 | - | |
| 02 | 2.5123: Reduce fluid flow rates | $3,226 | $1,220 |
$3,226
37,730
kWh
|
- | - | |
| 03 | 2.7313: Recycle air for heating, ventilation and air conditioning | $5,697 | $1,100 |
$462
5,407
kWh
|
- |
$5,235
-
MMBtu
|
|
| 04 | 2.4239: Eliminate or reduce compressed air usage | $1,003 | $1,920 |
$1,003
11,730
kWh
|
- | - | |
| 05 | 2.7231: Use radiant heater for spot heating | $5,208 | $8,000 | - | - |
$5,208
-
MMBtu
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $40,450 | $84,450 |
$40,450
473,100
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,256 | $15,290 |
$6,256
73,200
kWh
|
- | - | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $69,163 | $135,000 |
$69,163
808,920
kWh
|
- | - | |
| TOTAL RECOMMENDED | $154,453 | $246,980 |
$124,810
1,434,957
kWh
|
$19,200 |
$10,443
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $46,706 | $99,740 |
$46,706
546,300
kWh
|
- | - | ||