Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Poultry Processing
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 103,652
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $859,114 14,609,800
kWh
Electricity Demand $194,071 31,023
kW-mo/yr
Electricity Fees $37,070 -
Natural Gas $298,846 45,549
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,672 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,662 $51,336 $6,798
115,600
kWh
$1,736
-
kW-mo/yr
$128
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,625 $24,932 $3,625
61,632
kWh
$932
-
kW-mo/yr
$68
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,384 $351 $2,349
39,943
kWh
- $35
TOTAL RECOMMENDED $15,672 $76,619 $12,772
217,175
kWh
$2,668
-
kW-mo/yr
$232
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs