Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

657

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Water supply and irrigation systems
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0176 #01 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $38,336 $48,250
MA0832 #04 Y:2022 Lower temperature during the winter season and vice-versa $1,184 $600
MA0832 #03 Y:2022 Use heat pump for space conditioning $1,101 $12,675
MA0832 #02 Y:2022 Use heat pump for space conditioning $3,806 $2,150
MA0832 #01 Y:2022 Change procedures / equipment / operating conditions $2,405 $900
UU0197 #07 Y:2022 Use optimum temperature $380 $200
UU0197 #06 Y:2022 Demolish old building to reduce tax and insurance bills $130 $25
UU0197 #05 Y:2022 Optimize plant power factor $1,591 $6,000
UU0197 #04 Y:2022 Reschedule plant operations or reduce load to avoid peaks $12,230 $4,000
UU0197 #03 Y:2022 Change rate schedules or other changes in utility service $10,900 $3,000
UU0197 #02 Y:2022 Demolish old building to reduce tax and insurance bills $12,033 $300
UU0197 #01 Y:2022 Use power during off-peak periods $13,098 $10,000
CL2113 #03 Y:2021 Reschedule plant operations or reduce load to avoid peaks $10,986 $400
CL2113 #02 Y:2021 Modify facility to avoid excess maintenance costs $35,000 $12,000
CL2113 #01 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $34,351 $62,500
TT0264 #04 Y:2021 Install timers and/or thermostats $475 $700
TT0264 #03 Y:2021 Utilize higher efficiency lamps and/or ballasts $23,609 $36,617
TT0264 #02 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $26,057 $60,000
TT0264 #01 Y:2021 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $179,945 $100,000
UK2103 #04 Y:2021 Lower temperature during the winter season and vice-versa $328 -