ITAC Assessment: UU0197
ITAC logo
ITAC Assessment: UU0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Water Distribution
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $1
M
to 5
M
# of Employees 11
Plant Area 11,500
ft2
Annual Production 710,360
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,360 1,977,372
kWh
Electricity Demand $72,382 9,282
kW-mo/yr
Electricity Fees $16,274 -
Natural Gas $1,288 120
MMBtu
TOTAL YEARLY COSTS $214,304
RECOMMENDED SAVINGS* $50,362 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,391

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3137: Use power during off-peak periods $13,098 $10,000 - - - $13,098
02 4.811: Demolish old building to reduce tax and insurance bills $12,033 $300 - - - $12,033
03 2.8114: Change rate schedules or other changes in utility service $10,900 $3,000 - - - $10,900
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $12,230 $4,000 $1,330
18,083
kWh
- - $10,900
05 2.3212: Optimize plant power factor $1,591 $6,000 - $1,591 - -
06 4.811: Demolish old building to reduce tax and insurance bills $130 $25 - - - $130
07 2.2211: Use optimum temperature $380 $200 - - $380
-
MMBtu
-
TOTAL RECOMMENDED $50,362 $23,525 $1,330
18,083
kWh
$1,591 $380
-
MMBtu
$47,061
TOTAL IMPLEMENTED $48,391 $17,325 $1,330
18,083
kWh
- - $47,061
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs