ITAC Assessment: ND0016
ITAC logo
ITAC Assessment: ND0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PLASTIC MOULDINGS
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range less than $500
k
# of Employees 44
Plant Area
n/a
Annual Production 600
pieces
Production Hrs. Annual 2,145
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,022 352,872
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,451 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7492: Use proper thickness of insulation on building envelope $5,825 $8,880 - $5,825
-
MMBtu
-
02 2.8121: Apply for tax-free status for energy purchases $1,800 $250 $1,400
-
kWh
$400
-
MMBtu
-
03 2.7492: Use proper thickness of insulation on building envelope $600 $1,930 - $600
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $81 - $186
2,345
kWh
- $(-105.0)
05 2.4221: Install compressor air intakes in coolest locations $145 $200 $145
1,758
kWh
- -
TOTAL RECOMMENDED $8,451 $11,260 $1,731
4,103
kWh
$6,825
-
MMBtu
$(-105.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs