ITAC Assessment: WM0176
ITAC logo
ITAC Assessment: WM0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Treated water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $5
M
to 10
M
# of Employees 10
Plant Area 37,730
ft2
Annual Production 2,737,500
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,748 4,936,013
kWh
Electricity Demand $130,583 9,206
kW-mo/yr
Electricity Fees $41,018 -
Natural Gas $32,405 4,606
MMBtu
TOTAL YEARLY COSTS $480,754
RECOMMENDED SAVINGS* $65,447 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $38,336 $48,250 $28,463
508,275
kWh
$9,873
-
kW-mo/yr
-
02 2.4314: Use synthetic lubricant $12,068 $10,000 $8,962
160,034
kWh
$3,107
-
kW-mo/yr
-
03 2.3212: Optimize plant power factor $6,319 $24,625 - $6,319
-
kW-mo/yr
-
04 2.2414: Use waste heat from hot flue gases to preheat $4,784 $7,000 - - $4,784
-
MMBtu
05 2.7135: Install occupancy sensors $2,638 $6,572 $2,085
37,235
kWh
$553
-
kW-mo/yr
-
06 2.7221: Lower temperature during the winter season and vice-versa $1,301 - - - $1,301
-
MMBtu
TOTAL RECOMMENDED $65,447 $96,447 $39,510
705,544
kWh
$19,851
-
kW-mo/yr
$6,085
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs