ITAC Assessment: SF0135
ITAC logo
ITAC Assessment: SF0135
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Telecommunications Equipment
NAICS
n/a
SIC 3661: Telephone and Telegraph Apparatus
Sales Range $50
M
to 100
M
# of Employees 270
Plant Area 105,000
ft2
Annual Production 24,000
pieces
Production Hrs. Annual 3,380
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,639 1,586,166
kWh
Electricity Demand $18,141 4,099
kW-mo/yr
Natural Gas $7,013 1,103
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,625 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,219

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.6218: Turn off equipment when not in use $1,024 - $1,024
12,016
kWh
- - -
02 2.7261: Install timers and/or thermostats $5,884 $280 $5,884
68,288
kWh
- - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,527 $1,180 $2,226
25,791
kWh
- $(-699.0)
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $415 $329 $366
4,396
kWh
$49
-
kW-mo/yr
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,572 $1,742 $2,240
26,084
kWh
- $(-668.0)
-
MMBtu
-
06 2.7144: Install spectral reflectors / delamp $9,888 $13,781 $8,707
101,114
kWh
$1,181
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $258 $1,700 $241
2,931
kWh
$17
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $804 $1,792 $670
7,913
kWh
$134
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $3,036 $8,557 $2,488
29,015
kWh
$548
-
kW-mo/yr
- -
10 3.5313: Increase amount of waste recovered for resale $11,710 $250 - - - $11,710
-
lb
11 3.5315: Lease / purchase baler; sell cardboard to recycler $8,504 $250 - - - $8,504
-
lb
12 3.5313: Increase amount of waste recovered for resale $3,003 $250 - - - $3,003
-
lb
TOTAL RECOMMENDED $47,625 $30,111 $23,846
277,548
kWh
$1,929
-
kW-mo/yr
$(-1,367.0)
-
MMBtu
$23,217
-
lb
TOTAL IMPLEMENTED $19,219 $2,572 $7,578
88,217
kWh
$134
-
kW-mo/yr
- $11,507
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs