| Assessment Year | 1998 |
|---|---|
| Principal Product | Telecommunications Equipment |
| NAICS |
n/a
|
| SIC | 3661: Telephone and Telegraph Apparatus |
| Sales Range | $50 M to 100M |
| # of Employees | 270 |
| Plant Area |
105,000
ft2
|
| Annual Production | 24,000
pieces
|
| Production Hrs. Annual | 3,380
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $136,639 | 1,586,166 |
kWh
|
$0.086 |
| Electricity Demand | $18,141 | 4,099 |
kW-mo/yr
|
$4.43 |
| Natural Gas | $7,013 | 1,103 |
MMBtu
|
$6.36 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $47,625 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,219 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $1,024 | - |
$1,024
12,016
kWh
|
- | - | - | |
| 02 | 2.7261: Install timers and/or thermostats | $5,884 | $280 |
$5,884
68,288
kWh
|
- | - | - | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,527 | $1,180 |
$2,226
25,791
kWh
|
- |
$(-699.0)
-
MMBtu
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $415 | $329 |
$366
4,396
kWh
|
$49
-
kW-mo/yr
|
- | - | |
| 05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,572 | $1,742 |
$2,240
26,084
kWh
|
- |
$(-668.0)
-
MMBtu
|
- | |
| 06 | 2.7144: Install spectral reflectors / delamp | $9,888 | $13,781 |
$8,707
101,114
kWh
|
$1,181
-
kW-mo/yr
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $258 | $1,700 |
$241
2,931
kWh
|
$17
-
kW-mo/yr
|
- | - | |
| 08 | 2.7135: Install occupancy sensors | $804 | $1,792 |
$670
7,913
kWh
|
$134
-
kW-mo/yr
|
- | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,036 | $8,557 |
$2,488
29,015
kWh
|
$548
-
kW-mo/yr
|
- | - | |
| 10 | 3.5313: Increase amount of waste recovered for resale | $11,710 | $250 | - | - | - |
$11,710
-
lb
|
|
| 11 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $8,504 | $250 | - | - | - |
$8,504
-
lb
|
|
| 12 | 3.5313: Increase amount of waste recovered for resale | $3,003 | $250 | - | - | - |
$3,003
-
lb
|
|
| TOTAL RECOMMENDED | $47,625 | $30,111 |
$23,846
277,548
kWh
|
$1,929
-
kW-mo/yr
|
$(-1,367.0)
-
MMBtu
|
$23,217
-
lb
|
||
| TOTAL IMPLEMENTED | $19,219 | $2,572 |
$7,578
88,217
kWh
|
$134
-
kW-mo/yr
|
- |
$11,507
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs