ITAC Assessment: TT0175
ITAC logo
ITAC Assessment: TT0175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Automotive Components
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 331,000
ft2
Annual Production 16,000,000
units
Production Hrs. Annual 7,800
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,976,230 30,982,340
kWh
Electricity Demand $663,520 60,165
kW-mo/yr
Natural Gas $27,673 3,976
MMBtu
Waste Disposal Costs
Water Usage $28,126 10,877,570
Tgal
Water Disposal $33,062 10,878
Tgal
TOTAL YEARLY COSTS $2,728,611
RECOMMENDED SAVINGS* $83,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,373

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $40,909 $94,503 - $40,909
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $12,631 $125 $12,631
197,977
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $11,213 $25 $9,934
155,706
kWh
$1,279
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,579 $23,120 $7,579
118,800
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,500 $6,820 $3,500
54,860
kWh
- -
06 2.2622: Replace existing chiller with high efficiency model $3,374 $400 $3,265
51,168
kWh
$109
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,832 $2,400 $1,656
25,957
kWh
$176
-
kW-mo/yr
-
08 2.2515: Use optimum thickness insulation $1,726 $375 $1,726
27,048
kWh
- -
09 2.8114: Change rate schedules or other changes in utility service $1,155 $200 - - $1,155
TOTAL RECOMMENDED $83,919 $127,968 $40,291
631,516
kWh
$42,473
-
kW-mo/yr
$1,155
TOTAL IMPLEMENTED $28,373 $750 $25,830
404,851
kWh
$1,388
-
kW-mo/yr
$1,155
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs