ITAC Assessment: OK0486
ITAC logo
ITAC Assessment: OK0486
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Auto shock absorbers and struts
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 750
Plant Area 32,000,000
ft2
Annual Production 15,600,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $401,738 16,386,577
kWh
Electricity Demand $221,601 31,116
kW-mo/yr
Electricity Fees $54,204 -
Natural Gas $156,231 136,445
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,580

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,955 $5,951 $4,955
186,401
kWh
- - -
02 2.4221: Install compressor air intakes in coolest locations $5,401 $3,275 $3,333
125,440
kWh
$2,068
-
kW-mo/yr
- -
03 2.4312: Improve lubrication practices $4,213 - $2,600
97,890
kWh
$1,613
-
kW-mo/yr
- -
04 2.4224: Upgrade controls on compressors $1,548 $5,600 $1,548
58,324
kWh
- - -
05 2.7122: Disconnect ballasts $428 $1,060 $264
9,965
kWh
$164
-
kW-mo/yr
- -
06 2.2136: Install / repair insulation on steam lines $203 $757 - - $203
-
MMBtu
-
07 3.4113: Treat and reuse rinse waters $17,249 - - - - $17,249
-
gal
TOTAL RECOMMENDED $33,997 $16,643 $12,700
478,020
kWh
$3,845
-
kW-mo/yr
$203
-
MMBtu
$17,249
-
gal
TOTAL IMPLEMENTED $7,580 $10,692 $5,145
193,729
kWh
$2,232
-
kW-mo/yr
$203
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs