| Assessment Year | 2022 |
|---|---|
| Principal Product | Potable Water |
| NAICS | 221310: Water Supply and Irrigation Systems |
| SIC | 4941: Water Supply |
| Sales Range | $10 M to 50M |
| # of Employees | 106 |
| Plant Area |
32,600
ft2
|
| Annual Production | 4,396,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $649,305 | 10,225,728 |
kWh
|
$0.063 |
| Electricity Demand | $283,505 | 22,067 |
kW-mo/yr
|
$12.85 |
| TOTAL YEARLY COSTS | $932,810 | |||
| RECOMMENDED SAVINGS* | $230,086 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $206,002 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $179,945 | $100,000 |
$179,945
2,833,795
kWh
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $26,057 | $60,000 |
$20,399
321,253
kWh
|
$5,658
-
kW-mo/yr
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,609 | $36,617 |
$18,486
291,121
kWh
|
$5,123
-
kW-mo/yr
|
|
| 04 | 2.7261: Install timers and/or thermostats | $475 | $700 |
$475
7,485
kWh
|
- | |
| TOTAL RECOMMENDED | $230,086 | $197,317 |
$219,305
3,453,654
kWh
|
$10,781
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $206,002 | $160,000 |
$200,344
3,155,048
kWh
|
$5,658
-
kW-mo/yr
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs