ITAC Assessment: TT0264
ITAC logo
ITAC Assessment: TT0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Potable Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 106
Plant Area 32,600
ft2
Annual Production 4,396,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $649,305 10,225,728
kWh
Electricity Demand $283,505 22,067
kW-mo/yr
TOTAL YEARLY COSTS $932,810
RECOMMENDED SAVINGS* $230,086 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $206,002

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $179,945 $100,000 $179,945
2,833,795
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,057 $60,000 $20,399
321,253
kWh
$5,658
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $23,609 $36,617 $18,486
291,121
kWh
$5,123
-
kW-mo/yr
04 2.7261: Install timers and/or thermostats $475 $700 $475
7,485
kWh
-
TOTAL RECOMMENDED $230,086 $197,317 $219,305
3,453,654
kWh
$10,781
-
kW-mo/yr
TOTAL IMPLEMENTED $206,002 $160,000 $200,344
3,155,048
kWh
$5,658
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs