Assessment Year | 2022 |
---|---|
Principal Product | Fire Trucks |
NAICS | 336120: Heavy Duty Truck Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $10 M to 50M |
# of Employees | 480 |
Plant Area |
285,596
ft2
|
Annual Production | 423
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $227,555 | 4,992,261 |
kWh
|
$0.046 | |
Electricity Demand | $169,631 | 14,502 |
kW-mo/yr
|
$11.70 | |
Electricity Fees | $10,376 | - |
|
- | |
Natural Gas | $27,805 | 7,462 |
MMBtu
|
$3.73 | |
LPG | $15,932 | 823 |
MMBtu
|
$19.37 | |
Fuel Oil #1 | $130,362 | 6,384 |
MMBtu
|
$20.42 | |
Waste Disposal Costs | |||||
Water Usage | $21,001 | 2,212 |
Tgal
|
$9.49 | |
TOTAL YEARLY COSTS | $602,662 | ||||
RECOMMENDED SAVINGS* | $118,419 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $118,419 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $56,857 | $359,360 |
$28,827
626,668
kWh
|
$28,030
-
kW-mo/yr
|
- | - | |
02 | 2.3191: Use demand controller or load shedder | $27,950 | $26,859 |
$16,075
349,458
kWh
|
$11,875
-
kW-mo/yr
|
- | - | |
03 | 2.4112: Install soft-start to eliminate nuisance trips | $4,159 | $10,627 |
$4,159
90,415
kWh
|
- | - | - | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $4,152 | $3,218 |
$4,152
90,265
kWh
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $4,007 | $8,760 |
$4,007
87,113
kWh
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,414 | $756 |
$3,414
74,210
kWh
|
- | - | - | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $12,245 | $11,975 | - | - | - | $12,245 | |
08 | 3.4111: Use closed cycle process to minimize waste water production | $5,635 | $4,650 | - | - | $5,635 | - | |
TOTAL RECOMMENDED | $118,419 | $426,205 |
$60,634
1,318,129
kWh
|
$39,905
-
kW-mo/yr
|
$5,635 | $12,245 | ||
TOTAL IMPLEMENTED | $118,419 | $426,205 |
$60,634
1,318,129
kWh
|
$39,905
-
kW-mo/yr
|
$5,635 | $12,245 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs