ITAC Assessment: UF0572
ITAC logo
ITAC Assessment: UF0572
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Fire Trucks
NAICS 336120: Heavy Duty Truck Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 480
Plant Area 285,596
ft2
Annual Production 423
units
Production Hrs. Annual 4,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,555 4,992,261
kWh
Electricity Demand $169,631 14,502
kW-mo/yr
Electricity Fees $10,376 -
Natural Gas $27,805 7,462
MMBtu
LPG $15,932 823
MMBtu
Fuel Oil #1 $130,362 6,384
MMBtu
Waste Disposal Costs
Water Usage $21,001 2,212
Tgal
TOTAL YEARLY COSTS $602,662
RECOMMENDED SAVINGS* $118,419 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $118,419

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings By-product Production Savings
01 2.9114: Use solar heat to make electricty $56,857 $359,360 $28,827
626,668
kWh
$28,030
-
kW-mo/yr
- -
02 2.3191: Use demand controller or load shedder $27,950 $26,859 $16,075
349,458
kWh
$11,875
-
kW-mo/yr
- -
03 2.4112: Install soft-start to eliminate nuisance trips $4,159 $10,627 $4,159
90,415
kWh
- - -
04 2.6212: Turn off equipment during breaks, reduce operating time $4,152 $3,218 $4,152
90,265
kWh
- - -
05 2.7135: Install occupancy sensors $4,007 $8,760 $4,007
87,113
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,414 $756 $3,414
74,210
kWh
- - -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $12,245 $11,975 - - - $12,245
08 3.4111: Use closed cycle process to minimize waste water production $5,635 $4,650 - - $5,635 -
TOTAL RECOMMENDED $118,419 $426,205 $60,634
1,318,129
kWh
$39,905
-
kW-mo/yr
$5,635 $12,245
TOTAL IMPLEMENTED $118,419 $426,205 $60,634
1,318,129
kWh
$39,905
-
kW-mo/yr
$5,635 $12,245
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs