ITAC Assessment: KU0328
ITAC logo
ITAC Assessment: KU0328
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product DAILY NEWSPAPER
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $1
M
to 5
M
# of Employees 180
Plant Area
n/a
Annual Production 4,300
ton
Production Hrs. Annual 1,460
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,823 1,783,118
kWh
Natural Gas $11,305 2,401
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $546

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7263: Lower compressor pressure through a/c system modification $4,413 $8,400 $4,413
87,632
kWh
-
02 2.7261: Install timers and/or thermostats $2,273 $3,200 $2,273
45,135
kWh
-
03 2.2437: Recover waste heat from equipment $1,446 $420 - $1,446
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,181 $150 $1,181
23,447
kWh
-
05 2.6232: Install set-back timers $723 $600 $723
14,361
kWh
-
06 2.7229: Air condition only space necessary $590 $210 $369
7,327
kWh
$221
-
MMBtu
07 2.4312: Improve lubrication practices $546 - $546
10,844
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $456 $560 $456
9,086
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $339 $280 $339
6,741
kWh
-
10 2.6121: Reduce hot water temperature to the minimum required $273 - - $273
-
MMBtu
TOTAL RECOMMENDED $12,240 $13,820 $10,300
204,573
kWh
$1,940
-
MMBtu
TOTAL IMPLEMENTED $546 - $546
10,844
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs