ITAC Assessment: UK2103
ITAC logo
ITAC Assessment: UK2103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product potable drinking water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $1
M
to 5
M
# of Employees 4
Plant Area 9,483
ft2
Annual Production 500,000
Tgal
Production Hrs. Annual 4,500
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,288 1,588,000
kWh
Electricity Demand $61,479 4,497
kW-mo/yr
Electricity Fees $293 -
TOTAL YEARLY COSTS $162,060
RECOMMENDED SAVINGS* $54,190 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $51,422 - $28,456
451,690
kWh
$22,966
-
kW-mo/yr
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $54 $63 $34
540
kWh
$20
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,386 $4,128 $1,828
29,017
kWh
$558
-
kW-mo/yr
04 2.7221: Lower temperature during the winter season and vice-versa $328 - $328
5,210
kWh
-
TOTAL RECOMMENDED $54,190 $4,191 $30,646
486,457
kWh
$23,544
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs