| Assessment Year | 2001 |
|---|---|
| Principal Product | Lithographic printing |
| NAICS |
n/a
|
| SIC | 2752: Commercial Printing, Lithographic |
| Sales Range | $100 M to 500M |
| # of Employees | 275 |
| Plant Area |
166,000
ft2
|
| Annual Production | 100,000
ton
|
| Production Hrs. Annual | 8,448
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $466,836 | 8,999,233 |
kWh
|
$0.052 |
| Electricity Demand | $110,279 | 18,276 |
kW-mo/yr
|
$6.03 |
| Electricity Fees | $5,880 | - |
|
- |
| Natural Gas | $319,738 | 45,900 |
MMBtu
|
$6.97 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $239,820 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $224,380 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.322: Eliminate old stock and modify inventory control | $198,000 | $25,000 | - | - | - | $198,000 | |
| 02 | 3.7132: Reuse rags until completely soiled | $12,600 | - | - | - |
$12,600
-
lb
|
- | |
| 03 | 3.5316: Contract a wood pallet recycling company | $15,440 | - | - | - |
$15,440
-
lb
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,330 | $41,800 |
$3,220
65,000
kWh
|
$1,190
-
kW-mo/yr
|
- | $1,920 | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,800 | $2,828 |
$2,500
50,500
kWh
|
$1,300
-
kW-mo/yr
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,710 | $368 |
$2,710
54,700
kWh
|
- | - | - | |
| 07 | 2.6212: Turn off equipment during breaks, reduce operating time | $250 | - |
$250
5,000
kWh
|
- | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $690 | $765 |
$320
6,520
kWh
|
$110
-
kW-mo/yr
|
- | $260 | |
| TOTAL RECOMMENDED | $239,820 | $70,761 |
$9,000
181,720
kWh
|
$2,600
-
kW-mo/yr
|
$28,040
-
lb
|
$200,180 | ||
| TOTAL IMPLEMENTED | $224,380 | $70,761 |
$9,000
181,720
kWh
|
$2,600
-
kW-mo/yr
|
$12,600
-
lb
|
$200,180 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs