Recommendation Types
ITAC logo
Recommendation Types
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

The Assessment Recommendation Codes ARC is the ITAC system for classifying recommendation types.

ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

See the Assessment Recommendation Codes ARC Manual for additional details.

ARC Text Search
Clear
Description Rec's Rec'd $ Savings Avg PB Imp Rate
2.xxxx: ENERGY MANAGEMENT 145k $14k 1.8 yrs 51.0%
2.3xxx: Electrical Power 6.9k $51k 1.6 yrs 35.7%
2.31xx: DEMAND MANAGEMENT 3.3k $17k 0.7 yrs 40.0%
2.313x: Scheduling 2.5k $12k 0.4 yrs 41.8%
2.3131: RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS 1.6k $14k 0.4 yrs 39.8%
2.3132: RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS 537 $5.4k 0.5 yrs 52.7%
2.3133: CONSIDER THREE OR FOUR DAYS AROUND-THE-CLOCK OPERATION RATHER THAN ONE OR TWO SHIFTS PER DAY 8 $5.6k 0.2 yrs 42.9%
2.3134: SHIFT FROM DAYTIME TO NIGHTTIME OPERATION 124 $22k 0.2 yrs 28.0%
2.3135: SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS 24 $4.7k 0.2 yrs 50.0%
2.3136: OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS 17 $1.6k 0.3 yrs 17.6%
2.3137: USE POWER DURING OFF-PEAK PERIODS 188 $16k 0.3 yrs 40.2%