151,546
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UU0307 #03 Y:2026 | 03 | 2026 | Replace boiler | $1,650 | $37,000 |
n/a
|
| UU0307 #02 Y:2026 | 02 | 2026 | Use computer programs to optimize hvac performance | $2,800 | $8,580 |
n/a
|
| UU0307 #01 Y:2026 | 01 | 2026 | Close outdoor air dampers during warm-up / cool-down periods | $1,950 | $4,000 |
n/a
|
| MS0473 #06 Y:2026 | 06 | 2026 | Insulate bare equipment | $275 | $133 |
n/a
|
| MS0473 #05 Y:2026 | 05 | 2026 | Install occupancy sensors | $1,879 | $1,271 |
n/a
|
| MS0473 #04 Y:2026 | 04 | 2026 | Use properly designed and sized hvac equipment | $229 | $450 |
n/a
|
| MS0473 #03 Y:2026 | 03 | 2026 | Reduce heat gain by window tinting | $1,386 | $5,292 |
n/a
|
| MS0473 #02 Y:2026 | 02 | 2026 | Use computer programs to optimize hvac performance | $4,835 | $466 |
n/a
|
| MS0473 #01 Y:2026 | 01 | 2026 | Keep equipment clean | $2,579 | $200 |
n/a
|
| NT0068 #09 Y:2026 | 09 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,352 | $5,753 |
n/a
|
| NT0068 #08 Y:2026 | 08 | 2026 | Reduce the pressure of compressed air to the minimum required | $4,513 | - |
n/a
|
| NT0068 #07 Y:2026 | 07 | 2026 | Optimize plant power factor | $7,455 | $7,713 |
n/a
|
| NT0068 #06 Y:2026 | 06 | 2026 | Utilize higher efficiency lamps and/or ballasts | $17,984 | $36,353 |
n/a
|
| NT0068 #05 Y:2026 | 05 | 2026 | Apply for tax-free status for energy purchases | $23,121 | $5,000 |
n/a
|
| NT0068 #04 Y:2026 | 04 | 2026 | Use / purchase optimum sized compressor | $30,395 | $30,400 |
n/a
|
| NT0068 #03 Y:2026 | 03 | 2026 | Replace existing hvac unit with high efficiency model | $64,369 | $178,500 |
n/a
|
| LE0616 #06 Y:2026 | 06 | 2026 | Install compressor air intakes in coolest locations | $1,024 | $4,000 |
n/a
|
| LE0616 #05 Y:2026 | 05 | 2026 | Use solar heat to heat water | $42,290 | $125,212 |
n/a
|
| LE0616 #04 Y:2026 | 04 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,850 | $4,000 |
n/a
|
| LE0616 #03 Y:2026 | 03 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $2,401 | $2,000 |
n/a
|