Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147,816

matching recommendations
$
$
ARC Energy management
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0964 #04 Y:2025 Use solar heat to make electricty $14,450 $391,560
AM0964 #03 Y:2025 Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $2,267 $54,600
AM0964 #02 Y:2025 Install occupancy sensors $4,064 $19,460
AM0964 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,372 $15,151
SD0679 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $33,723 $25,291
SD0679 #04 Y:2025 Recharge batteries on during off-peak demand periods $10,098 -
SD0679 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $5,125 -
SD0679 #02 Y:2025 Use battery storage for demand control $18,281 $1,472
SD0679 #01 Y:2025 Use solar heat to make electricty $146,915 $287,273
MI0463 #05 Y:2025 Install partitions to reduce size of conditioned space $13,397 $26,570
MI0463 #04 Y:2025 Turn off equipment during breaks, reduce operating time $10,085 $1,600
MI0463 #03 Y:2025 Reduce space conditioning during non-working hours $4,194 -
MI0463 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $4,549 -
MI0463 #01 Y:2025 Recharge batteries on during off-peak demand periods $4,871 -
UL2510 #04 Y:2025 Install occupancy sensors $1,506 $185
UL2510 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $4,413 $9,750
UL2510 #02 Y:2025 Use solar heat to make electricty $71,181 $417,175
UL2510 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,769 $3,240
MI0461 #05 Y:2025 Replace existing hvac unit with high efficiency model $6,646 $33,112
MI0461 #04 Y:2025 Turn off equipment during breaks, reduce operating time $3,684 $2,240