10,102
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UD1120 #07 Y:2025 | 07 | 2025 | Use solar heat to make electricty | $13,285 | $224,000 |
n/a
|
UD1120 #06 Y:2025 | 06 | 2025 | Use solar heat to make electricty | $969 | $500 |
n/a
|
UD1120 #05 Y:2025 | 05 | 2025 | Use or replace with energy efficient substitutes | $630 | $30,000 |
n/a
|
UD1120 #04 Y:2025 | 04 | 2025 | Utilize a less expensive cooling method | $120 | $300 |
n/a
|
UD1120 #03 Y:2025 | 03 | 2025 | Use hot process fluids to preheat incoming process fluids | $767 | $10,000 |
n/a
|
UD1120 #02 Y:2025 | 02 | 2025 | Utilize a less expensive cooling method | $861 | $2,000 |
n/a
|
UD1120 #01 Y:2025 | 01 | 2025 | Utilize a less expensive cooling method | $1,599 | $2,000 |
n/a
|
UD1119 #06 Y:2025 | 06 | 2025 | Use heat pump for space conditioning | $24,495 | $100,000 |
n/a
|
UD1119 #05 Y:2025 | 05 | 2025 | Use or replace with energy efficient substitutes | $649 | $6,400 |
n/a
|
UD1119 #04 Y:2025 | 04 | 2025 | Utilize a less expensive cooling method | $855 | $550 |
n/a
|
UD1119 #03 Y:2025 | 03 | 2025 | Use solar heat to make electricty | $7,022 | $100,000 |
n/a
|
UD1119 #02 Y:2025 | 02 | 2025 | Utilize higher efficiency lamps and/or ballasts | $6,147 | $16,000 |
n/a
|
UD1119 #01 Y:2025 | 01 | 2025 | Utilize higher efficiency lamps and/or ballasts | $8,511 | $40,000 |
n/a
|
UD1115 #06 Y:2025 | 06 | 2025 | Install compressor air intakes in coolest locations | $1,479 | $1,015 |
n/a
|
UD1115 #05 Y:2025 | 05 | 2025 | Reduce the pressure of compressed air to the minimum required | $2,587 | $5,423 |
n/a
|
UD1115 #04 Y:2025 | 04 | 2025 | Insulate bare equipment | $892 | $1,267 |
n/a
|
UD1115 #03 Y:2025 | 03 | 2025 | Meter recycled water (to reduce sewer charges) | $1,016 | $760 |
n/a
|
UD1115 #02 Y:2025 | 02 | 2025 | Optimize plant power factor | $2,927 | $3,700 |
n/a
|
UD1115 #01 Y:2025 | 01 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $25,515 | $7,035 |
n/a
|
UD1114 #07 Y:2025 | 07 | 2025 | Optimize plant power factor | $7,290 | $15,550 |
n/a
|