Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,148

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1118 #07 Y:2025 Install occupancy sensors $186 $153
UD1118 #06 Y:2025 Eliminate leaks in water lines and valves $23,759 $18,000
UD1118 #05 Y:2025 Install compressor air intakes in coolest locations $723 $2,030
UD1118 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $894 -
UD1118 #03 Y:2025 Eliminate or reduce compressed air usage $3,394 $1,740
UD1118 #02 Y:2025 Install outside air damper / economizer on hvac unit $7,958 -
UD1118 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $9,142 -
UD1122 #06 Y:2025 Use solar heat to make electricty $92,949 $900,000
UD1122 #05 Y:2025 Use or replace with energy efficient substitutes $2,853 $25,000
UD1122 #04 Y:2025 Utilize a less expensive cooling method $124 $300
UD1122 #03 Y:2025 Preheat boiler makeup water with waste process heat $1,430 $7,500
UD1122 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $534 $4,000
UD1122 #01 Y:2025 Use heat pump for space conditioning $46,945 $400,000
UD1117 #06 Y:2025 Recover waste heat from equipment $1,029 $4,975
UD1117 #05 Y:2025 Reschedule plant operations or reduce load to avoid peaks $8,113 -
UD1117 #04 Y:2025 Optimize plant power factor $13,183 $15,550
UD1117 #03 Y:2025 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $2,839 $947
UD1117 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $2,150 -
UD1117 #01 Y:2025 Install compressor air intakes in coolest locations $3,656 $1,015
UD1121 #07 Y:2025 Use solar heat to make electricty $10,502 $160,000