ITAC Assessment: UD1136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product English muffins and soft rolls
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 180,000
ft2
Annual Production 99,473,267
lb
Production Hrs. Annual 7,800
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $853,395 15,296,852
kWh
Electricity Demand $133,763 33,574
kW-mo/yr
Electricity Fees $4,065 -
Natural Gas $458,724 78,556
MMBtu
Waste Disposal Costs
Water Usage $95,161 10,574
Tgal
Water Disposal $126,883 10,574
Tgal
Other Liquid (non-haz) $604 1
gal
TOTAL YEARLY COSTS $1,672,595
RECOMMENDED SAVINGS* $83,520 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings
01 3.4156: Use flow control valves on equipment to optimize water use $37,800 $1,039 - - $16,200
-
Tgal
$21,600
-
Tgal
02 2.7241: Install outside air damper / economizer on hvac unit $19,330 $720 $19,330
346,412
kWh
- - -
03 2.4239: Eliminate or reduce compressed air usage $12,682 $5,792 $12,682
227,270
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $11,142 $4,800 $10,039
179,916
kWh
$1,103
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $2,565 $1,504 $2,565
45,964
kWh
- - -
TOTAL RECOMMENDED $83,520 $13,855 $44,616
799,562
kWh
$1,103
-
kW-mo/yr
$16,200
-
Tgal
$21,600
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs