ITAC Assessment: UD1131
ITAC logo
ITAC Assessment: UD1131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Food ingredient powders
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 50,000
ft2
Annual Production 1,327,167
lb
Production Hrs. Annual 5,508
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,821 499,200
kWh
Electricity Demand $20,452 1,602
kW-mo/yr
Electricity Fees $113 -
Natural Gas $76,837 9,666
MMBtu
Waste Disposal Costs
Water Usage $300 33
Tgal
Water Disposal $507 33
Tgal
TOTAL YEARLY COSTS $145,030
RECOMMENDED SAVINGS* $22,041 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,189 - - - $2,189
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $844 - $651
6,942
kWh
$193
-
kW-mo/yr
-
03 2.2442: Preheat combustion air with waste heat $16,940 $25,320 $(-83.0)
(-881)
kWh
$(-2.0)
-
kW-mo/yr
$17,025
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,166 $953 $899
9,588
kWh
$267
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $902 $4,296 $696
7,415
kWh
$206
-
kW-mo/yr
-
TOTAL RECOMMENDED $22,041 $30,569 $2,163
23,064
kWh
$664
-
kW-mo/yr
$19,214
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs