| Assessment Year | 2026 |
|---|---|
| Principal Product | Food ingredient powders |
| NAICS | 339999: All Other Miscellaneous Manufacturing |
| SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
50,000
ft2
|
| Annual Production | 1,327,167
lb
|
| Production Hrs. Annual | 5,508
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $46,821 | 499,200 |
kWh
|
$0.094 | |
| Electricity Demand | $20,452 | 1,602 |
kW-mo/yr
|
$12.77 | |
| Electricity Fees | $113 | - |
|
- | |
| Natural Gas | $76,837 | 9,666 |
MMBtu
|
$7.95 | |
| Waste Disposal Costs | |||||
| Water Usage | $300 | 33 |
Tgal
|
$9.09 | |
| Water Disposal | $507 | 33 |
Tgal
|
$15.36 | |
| TOTAL YEARLY COSTS | $145,030 | ||||
| RECOMMENDED SAVINGS* | $22,041 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,189 | - | - | - |
$2,189
-
MMBtu
|
|
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $844 | - |
$651
6,942
kWh
|
$193
-
kW-mo/yr
|
- | |
| 03 | 2.2442: Preheat combustion air with waste heat | $16,940 | $25,320 |
$(-83.0)
(-881)
kWh
|
$(-2.0)
-
kW-mo/yr
|
$17,025
-
MMBtu
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,166 | $953 |
$899
9,588
kWh
|
$267
-
kW-mo/yr
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $902 | $4,296 |
$696
7,415
kWh
|
$206
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $22,041 | $30,569 |
$2,163
23,064
kWh
|
$664
-
kW-mo/yr
|
$19,214
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs