| Assessment Year | 2025 |
|---|---|
| Principal Product | Steel Drums |
| NAICS | 332439: Other Metal Container Manufacturing |
| SIC | 3412: Metal Shipping Barrels, Drums, Kegs, and Pails |
| Sales Range | greater than $500 M |
| # of Employees | 91 |
| Plant Area |
96,000
ft2
|
| Annual Production | 1,800,000
units
|
| Production Hrs. Annual | 3,840
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $232,644 | 3,404,847 |
kWh
|
$0.068 |
| Electricity Demand | $99,819 | 9,402 |
kW-mo/yr
|
$10.62 |
| Electricity Fees | $5,809 | - |
|
- |
| Natural Gas | $271,041 | 103,798 |
MMBtu
|
$2.61 |
| TOTAL YEARLY COSTS | $609,313 | |||
| RECOMMENDED SAVINGS* | $58,812 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7232: Replace existing hvac unit with high efficiency model | $19,014 | $87,150 | - | - |
$19,014
-
MMBtu
|
|
| 02 | 2.4224: Upgrade controls on compressors | $10,999 | $24,995 |
$8,467
123,971
kWh
|
$2,532
-
kW-mo/yr
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $5,202 | $7,240 |
$4,764
68,754
kWh
|
- |
$438
-
MMBtu
|
|
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,709 | $4,792 |
$3,180
46,564
kWh
|
$1,529
-
kW-mo/yr
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,699 | $450 |
$3,244
47,503
kWh
|
$1,455
-
kW-mo/yr
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,359 | $1,140 |
$3,010
44,068
kWh
|
$1,349
-
kW-mo/yr
|
- | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,306 | $3,315 | - | - |
$4,306
-
MMBtu
|
|
| 08 | 2.4151: Develop a repair/replace policy | $2,011 | $4,865 |
$1,384
20,262
kWh
|
$627
-
kW-mo/yr
|
- | |
| 09 | 2.7135: Install occupancy sensors | $1,018 | $1,080 |
$540
7,912
kWh
|
$478
-
kW-mo/yr
|
- | |
| 10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $936 | $3,450 |
$(-181.0)
(-2,643)
kWh
|
- |
$1,117
-
MMBtu
|
|
| 11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $667 | $3,232 |
$455
6,658
kWh
|
$212
-
kW-mo/yr
|
- | |
| 12 | 2.4239: Eliminate or reduce compressed air usage | $539 | $285 |
$369
5,408
kWh
|
$170
-
kW-mo/yr
|
- | |
| 13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $353 | $1,056 |
$247
3,619
kWh
|
$106
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $58,812 | $143,050 |
$25,479
372,076
kWh
|
$8,458
-
kW-mo/yr
|
$24,875
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs