ITAC Assessment: UD1130
ITAC logo
ITAC Assessment: UD1130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Bakelite, Plastics Materials, Synthetic Resins
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 200,000
ft2
Annual Production 21,569,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $592,642 9,168,000
kWh
Electricity Demand $259,459 15,156
kW-mo/yr
Electricity Fees $1,911 -
Natural Gas $714,255 161,706
MMBtu
Waste Disposal Costs
Water Usage $408,124 35,299
Tgal
Other Liquid (non-haz) $960 1
gal
TOTAL YEARLY COSTS $1,977,351
RECOMMENDED SAVINGS* $98,178 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2113: Repair or replace steam traps $59,632 $9,336 - - $59,632
-
MMBtu
- - -
02 2.2121: Increase amount of condensate returned $7,277 $7,899 - - $2,176
-
MMBtu
$5,101
-
Tgal
- -
03 2.2136: Install / repair insulation on steam lines $2,206 $633 - - $2,206
-
MMBtu
- - -
04 2.4113: Install motor voltage controller on lightly loaded motors $10,947 $3,607 $7,251
112,252
kWh
$3,696
-
kW-mo/yr
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,951 $953 $6,567
101,655
kWh
$2,384
-
kW-mo/yr
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $6,540 $5,408 $4,798
74,265
kWh
$1,742
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $996 $759 $623
9,637
kWh
$317
-
kW-mo/yr
- - $56 -
08 2.7122: Disconnect ballasts $901 $300 $593
9,180
kWh
$308
-
kW-mo/yr
- - - -
09 2.7135: Install occupancy sensors $728 $393 $192
2,965
kWh
$195
-
kW-mo/yr
- - $281 $60
TOTAL RECOMMENDED $98,178 $29,288 $20,024
309,954
kWh
$8,642
-
kW-mo/yr
$64,014
-
MMBtu
$5,101
-
Tgal
$337 $60
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs