| Assessment Year | 2026 |
|---|---|
| Principal Product | Bakelite, Plastics Materials, Synthetic Resins |
| NAICS | 325211: Plastics Material and Resin Manufacturing |
| SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
| Sales Range | $10 M to 50M |
| # of Employees | 54 |
| Plant Area |
200,000
ft2
|
| Annual Production | 21,569,000,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $592,642 | 9,168,000 |
kWh
|
$0.065 | |
| Electricity Demand | $259,459 | 15,156 |
kW-mo/yr
|
$17.12 | |
| Electricity Fees | $1,911 | - |
|
- | |
| Natural Gas | $714,255 | 161,706 |
MMBtu
|
$4.42 | |
| Waste Disposal Costs | |||||
| Water Usage | $408,124 | 35,299 |
Tgal
|
$11.56 | |
| Other Liquid (non-haz) | $960 | 1 |
gal
|
$960.00 | |
| TOTAL YEARLY COSTS | $1,977,351 | ||||
| RECOMMENDED SAVINGS* | $98,178 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2113: Repair or replace steam traps | $59,632 | $9,336 | - | - |
$59,632
-
MMBtu
|
- | - | - | |
| 02 | 2.2121: Increase amount of condensate returned | $7,277 | $7,899 | - | - |
$2,176
-
MMBtu
|
$5,101
-
Tgal
|
- | - | |
| 03 | 2.2136: Install / repair insulation on steam lines | $2,206 | $633 | - | - |
$2,206
-
MMBtu
|
- | - | - | |
| 04 | 2.4113: Install motor voltage controller on lightly loaded motors | $10,947 | $3,607 |
$7,251
112,252
kWh
|
$3,696
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,951 | $953 |
$6,567
101,655
kWh
|
$2,384
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,540 | $5,408 |
$4,798
74,265
kWh
|
$1,742
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $996 | $759 |
$623
9,637
kWh
|
$317
-
kW-mo/yr
|
- | - | $56 | - | |
| 08 | 2.7122: Disconnect ballasts | $901 | $300 |
$593
9,180
kWh
|
$308
-
kW-mo/yr
|
- | - | - | - | |
| 09 | 2.7135: Install occupancy sensors | $728 | $393 |
$192
2,965
kWh
|
$195
-
kW-mo/yr
|
- | - | $281 | $60 | |
| TOTAL RECOMMENDED | $98,178 | $29,288 |
$20,024
309,954
kWh
|
$8,642
-
kW-mo/yr
|
$64,014
-
MMBtu
|
$5,101
-
Tgal
|
$337 | $60 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs