ITAC Assessment: UD1128
ITAC logo
ITAC Assessment: UD1128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Household Cleaning, Cosmetics, Adhesives, and Personal Care Products
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 196,000
ft2
Annual Production 40,000,000
units
Production Hrs. Annual 6,888
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $442,371 7,682,064
kWh
Electricity Demand $260,820 15,842
kW-mo/yr
Electricity Fees $3,350 -
Natural Gas $137,209 17,587
MMBtu
Waste Disposal Costs
Water Usage $9,439 300
Tgal
TOTAL YEARLY COSTS $853,189
RECOMMENDED SAVINGS* $103,697 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.8114: Change rate schedules or other changes in utility service $29,465 - - - - $29,465
-
MMBtu
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,321 - $16,236
281,880
kWh
$8,085
-
kW-mo/yr
- - - -
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $2,524 - $775
13,478
kWh
$1,067
-
kW-mo/yr
- - $647 $35
04 2.7314: Reduce ventilation air $31,291 - - - $31,291
-
MMBtu
- - -
05 2.7447: Install vinyl strip / high speed / air curtain doors $172 $600 - - $172
-
MMBtu
- - -
06 2.4239: Eliminate or reduce compressed air usage $8,922 - $8,922
155,168
kWh
- - - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,002 $828 $4,684
80,843
kWh
$2,318
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $103,697 $1,428 $30,617
531,369
kWh
$11,470
-
kW-mo/yr
$31,463
-
MMBtu
$29,465
-
MMBtu
$647 $35
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs