ITAC Assessment: SD0327
ITAC logo
ITAC Assessment: SD0327
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Ice
NAICS 312113: Ice Manufacturing
SIC 2097: Manufactured Ice
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 31,000
ft2
Annual Production 76,500
ton
Production Hrs. Annual 4,791
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $309,534 3,420,643
kWh
Electricity Demand $76,189 9,983
kW-mo/yr
Natural Gas $15,665 2,703
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,947 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4321: Upgrade obsolete equipment $50,120 $850,000 $17,233
1,623,296
kWh
$27,323
-
kW-mo/yr
$5,564
-
MMBtu
-
02 2.2624: Use cold waste water to cool chiller feed water $15,838 $12,500 $15,838
158,385
kWh
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,257 $3,225 $2,883
31,778
kWh
$374
-
kW-mo/yr
- -
04 2.7111: Reduce illumination to minimum necessary levels $608 $32 $509
5,608
kWh
$99
-
kW-mo/yr
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,124 $5,000 - - - $2,124
-
lb
TOTAL RECOMMENDED $71,947 $870,757 $36,463
1,819,067
kWh
$27,796
-
kW-mo/yr
$5,564
-
MMBtu
$2,124
-
lb
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs