2,419
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK0309 #04 Y:1990 | 04 | 1990 | Improve lubrication practices | $1,235 | - | |
| OK0309 #03 Y:1990 | 03 | 1990 | Utilize energy-efficient belts and other improved mechanisms | $357 | - | |
| OK0309 #02 Y:1990 | 02 | 1990 | Install compressor air intakes in coolest locations | $114 | $221 | |
| OK0309 #01 Y:1990 | 01 | 1990 | Burn wood by-products for heat | $12,631 | $17,000 | |
| MO0001 #06 Y:1990 | 06 | 1990 | Use heat from boiler blowdown to preheat boiler feed water | $256 | $500 | |
| MO0001 #05 Y:1990 | 05 | 1990 | Utilize higher efficiency lamps and/or ballasts | $375 | $137 | |
| MO0001 #04 Y:1990 | 04 | 1990 | Install compressor air intakes in coolest locations | $1,805 | $750 | |
| MO0001 #03 Y:1990 | 03 | 1990 | Analyze flue gas for proper air/fuel ratio | $2,351 | $900 | |
| MO0001 #02 Y:1990 | 02 | 1990 | Utilize energy-efficient belts and other improved mechanisms | $3,122 | $2,500 | |
| MO0001 #01 Y:1990 | 01 | 1990 | Modify dye beck | $30,784 | $16,000 | |
| MA0179 #04 Y:1990 | 04 | 1990 | Utilize higher efficiency lamps and/or ballasts | $554 | $70 | |
| MA0179 #03 Y:1990 | 03 | 1990 | Replace electrically-operated equipment with fossil fuel equipment | $11,908 | $2,350 | |
| MA0179 #02 Y:1990 | 02 | 1990 | Recover and reuse cooling water | $10,670 | $8,250 | |
| MA0179 #01 Y:1990 | 01 | 1990 | Replace obsolete burners with more efficient ones | $13,039 | $43,000 | |
| KU0313 #05 Y:1990 | 05 | 1990 | Reduce hot water temperature to the minimum required | $104 | - | |
| KU0313 #04 Y:1990 | 04 | 1990 | Install timers and/or thermostats | $620 | $100 | |
| KU0313 #03 Y:1990 | 03 | 1990 | Reduce the pressure of compressed air to the minimum required | $2,866 | $80 | |
| KU0313 #02 Y:1990 | 02 | 1990 | Use hot process fluids to preheat incoming process fluids | $11,447 | $20,000 | |
| KU0313 #01 Y:1990 | 01 | 1990 | Use hot process fluids to preheat incoming process fluids | $16,847 | $4,000 | |
| GT0407 #06 Y:1990 | 06 | 1990 | Modify refrigeration system to operate at a lower pressure | $290 | $1,200 |