ITAC Assessment: MA0179
ITAC logo
ITAC Assessment: MA0179
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product MOLDED RUBBER PRODUCTS
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 95
Plant Area
n/a
Annual Production 1,200,000
lb
Production Hrs. Annual 6,540
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $291,520 3,610,786
kWh
Natural Gas $70,150 22,288
MMBtu
Fuel Oil #4 $34,366 6,396
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,171 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,224

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1221: Replace obsolete burners with more efficient ones $13,039 $43,000 - $13,039
-
MMBtu
-
02 3.4115: Recover and reuse cooling water $10,670 $8,250 $(-2,468.0)
(-33,998)
kWh
- $13,138
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $11,908 $2,350 $14,532
179,953
kWh
$(-2,624.0)
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $554 $70 $554
6,741
kWh
- -
TOTAL RECOMMENDED $36,171 $53,670 $12,618
152,696
kWh
$10,415
-
MMBtu
$13,138
TOTAL IMPLEMENTED $11,224 $8,320 $(-1,914.0)
(-27,257)
kWh
- $13,138
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs