Assessment Year 1994
Principal Product Plastic Jugs
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $1
M
to 5
M
# of Employees 27
Plant Area 14,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,320
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,794 2,085,287
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,751

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $897 $2,000 $897
31,653
kWh
-
02 2.4133: Use most efficient type of electric motors $2,085 $3,659 $2,085
72,098
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,724 $6,475 $1,724
59,789
kWh
-
04 2.3212: Optimize plant power factor $1,026 $1,400 $1,026
-
kWh
-
05 2.2612: Use cooling tower water instead of refrigeration $4,373 $14,067 $4,373
194,607
kWh
-
06 2.2621: Modify refrigeration system to operate at a lower pressure $845 - $845
37,515
kWh
-
07 3.1192: Reduce scrap production $7,200 $16,420 - $7,200
-
lb
TOTAL RECOMMENDED $18,150 $44,021 $10,950
395,662
kWh
$7,200
-
lb
TOTAL IMPLEMENTED $12,751 $28,554 $5,551
201,055
kWh
$7,200
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs