ITAC Assessment: IA0068
ITAC logo
ITAC Assessment: IA0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product PROCESSED MEAT
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $50
M
to 100
M
# of Employees 345
Plant Area
n/a
Annual Production 50,000,000
lb
Production Hrs. Annual 4,760
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $694,565 18,983,881
kWh
Natural Gas $406,470 95,859
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,601 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,476

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,350 $4,590 $1,350
36,928
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $5,707 $1,000 - $5,707
-
MMBtu
03 2.1213: Direct warmest air to combustion intake $1,173 $1,364 - $1,173
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $2,627 $1,059 $2,627
71,805
kWh
-
05 2.7135: Install occupancy sensors $2,984 $3,213 $2,984
81,477
kWh
-
06 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,325 $2,625 $1,325
36,342
kWh
-
07 2.2136: Install / repair insulation on steam lines $435 $168 - $435
-
MMBtu
TOTAL RECOMMENDED $15,601 $14,019 $8,286
226,552
kWh
$7,315
-
MMBtu
TOTAL IMPLEMENTED $10,476 $8,971 $4,334
118,405
kWh
$6,142
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs