ITAC Assessment: IA0420
ITAC logo
ITAC Assessment: IA0420
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Pasts for cas interios
NAICS 326140: Polystyrene Foam Product Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $100
M
to 500
M
# of Employees 850
Plant Area 350,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $918,866 29,589,727
kWh
Electricity Demand $490,783 5,191
kW-mo/yr
Electricity Fees $15,117 -
Natural Gas $754,306 79,311
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,633 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $5,339 $900 $3,885
122,058
kWh
$1,454
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,062 $1,000 $6,500
204,422
kWh
$2,562
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,179 $25 $3,714
116,813
kWh
$1,465
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $19,446 $1,000 - - $19,446
-
MMBtu
05 2.7135: Install occupancy sensors $881 $560 $881
27,714
kWh
- -
06 2.7124: Make a practice of turning off lights when not needed $2,156 $600 $2,156
67,800
kWh
- -
07 2.2136: Install / repair insulation on steam lines $14,440 $2,400 - - $14,440
-
MMBtu
08 2.4133: Use most efficient type of electric motors $13,130 $2,824 $9,418
296,152
kWh
$3,712
-
kW-mo/yr
-
TOTAL RECOMMENDED $69,633 $9,309 $26,554
834,959
kWh
$9,193
-
kW-mo/yr
$33,886
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs