ITAC Assessment: KU0313
ITAC logo
ITAC Assessment: KU0313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product RAIL ANCHORS
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area
n/a
Annual Production 20,000,000
pieces
Production Hrs. Annual 6,072
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,935 2,073,857
kWh
Natural Gas $114,699 48,731
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,884 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $16,847 $4,000 - $16,847
-
MMBtu
02 2.2444: Use hot process fluids to preheat incoming process fluids $11,447 $20,000 $11,447
193,142
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,866 $80 $2,866
48,359
kWh
-
04 2.7261: Install timers and/or thermostats $620 $100 - $620
-
MMBtu
05 2.6121: Reduce hot water temperature to the minimum required $104 - $104
1,758
kWh
-
TOTAL RECOMMENDED $31,884 $24,180 $14,417
243,259
kWh
$17,467
-
MMBtu
TOTAL IMPLEMENTED $14,933 $20,180 $14,313
241,501
kWh
$620
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs