Assessment Year | 1990 |
---|---|
Principal Product | RAIL ANCHORS |
NAICS |
n/a
|
SIC | 3462: Iron and Steel Forgings |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
n/a
|
Annual Production | 20,000,000
pieces
|
Production Hrs. Annual | 6,072
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $122,935 | 2,073,857 |
kWh
|
$0.059 |
Natural Gas | $114,699 | 48,731 |
MMBtu
|
$2.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,884 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,933 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $16,847 | $4,000 | - |
$16,847
-
MMBtu
|
|
02 | 2.2444: Use hot process fluids to preheat incoming process fluids | $11,447 | $20,000 |
$11,447
193,142
kWh
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,866 | $80 |
$2,866
48,359
kWh
|
- | |
04 | 2.7261: Install timers and/or thermostats | $620 | $100 | - |
$620
-
MMBtu
|
|
05 | 2.6121: Reduce hot water temperature to the minimum required | $104 | - |
$104
1,758
kWh
|
- | |
TOTAL RECOMMENDED | $31,884 | $24,180 |
$14,417
243,259
kWh
|
$17,467
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,933 | $20,180 |
$14,313
241,501
kWh
|
$620
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs