| Assessment Year | 2019 |
|---|---|
| Principal Product | custom molded rubber |
| NAICS | 326299: All Other Rubber Product Manufacturing |
| SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 40 |
| Plant Area |
35,000
ft2
|
| Annual Production | 300
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $99,747 | 1,324,443 |
kWh
|
$0.075 |
| Electricity Demand | $72,537 | 3,837 |
kW-mo/yr
|
$18.90 |
| Electricity Fees | $16,017 | - |
|
- |
| TOTAL YEARLY COSTS | $188,301 | |||
| RECOMMENDED SAVINGS* | $11,286 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,951 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,276 | $7,083 |
$3,394
45,067
kWh
|
$1,882
-
kW-mo/yr
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,233 | $600 |
$2,456
32,615
kWh
|
$777
-
kW-mo/yr
|
|
| 03 | 2.4133: Use most efficient type of electric motors | $1,476 | $4,242 |
$983
13,057
kWh
|
$493
-
kW-mo/yr
|
|
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $718 | - |
$718
9,545
kWh
|
- | |
| 05 | 2.7135: Install occupancy sensors | $441 | $540 |
$441
5,858
kWh
|
- | |
| 06 | 2.2511: Insulate bare equipment | $142 | $218 |
$142
1,888
kWh
|
- | |
| TOTAL RECOMMENDED | $11,286 | $12,683 |
$8,134
108,030
kWh
|
$3,152
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $3,951 | $600 |
$3,174
42,160
kWh
|
$777
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs