| Assessment Year | 2000 |
|---|---|
| Principal Product | Food Seasoning |
| NAICS |
n/a
|
| SIC | 2099: Food Preparations, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
109,000
ft2
|
| Annual Production | 430
ton
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $83,831 | 855,900 |
kWh
|
$0.098 |
| Natural Gas | $12,454 | 1,870 |
MMBtu
|
$6.66 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,457 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $412 | - | n/a |
$412
5,506
kWh
|
- |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $793 | $1,300 | n/a |
$793
8,111
kWh
|
- |
| 03 | 2.7132: Install timers on light switches in little used areas | $1,179 | $2,230 | n/a |
$1,179
12,064
kWh
|
- |
| 04 | 2.4133: Use most efficient type of electric motors | $3,335 | $3,274 | n/a |
$3,335
34,114
kWh
|
- |
| 05 | 2.7135: Install occupancy sensors | $891 | $1,920 | n/a |
$891
8,560
kWh
|
- |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,518 | $13,006 | n/a |
$3,518
35,988
kWh
|
- |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $714 | $3,660 | n/a |
$714
7,302
kWh
|
- |
| 08 | 3.5217: Reuse / recycle/ sell paper products | $615 | $46 | n/a | - |
$615
-
lb
|
| TOTAL RECOMMENDED | $11,457 | $25,436 |
$10,842
111,645
kWh
|
$615
-
lb
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs