ITAC Assessment: NC0318
ITAC logo
ITAC Assessment: NC0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Rough cut lumber
NAICS 423310: Lumber, Plywood, Millwork, and Wood Panel Merchant Wholesalers
SIC 2420:
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 120,000
ft2
Annual Production 11,000
thousand feet
Production Hrs. Annual 2,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,042 1,525,200
kWh
Electricity Demand $99,521 12,063
kW-mo/yr
Electricity Fees $295 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,040 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,838

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings By-product Production Savings
01 3.6192: Use a less expensive method of waste removal $39,375 $1,000 - - - - $39,375
02 2.3212: Optimize plant power factor $11,668 $20,000 - $11,668
-
kW-mo/yr
- - -
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $10,275 $18,500 $2,860
99,260
kWh
$7,415
-
kW-mo/yr
- - -
04 2.4151: Develop a repair/replace policy $443 $585 $123
4,263
kWh
$320
-
kW-mo/yr
- - -
05 2.4239: Eliminate or reduce compressed air usage $1,927 $5,332 $394
13,677
kWh
$1,533
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $244 $100 $263
9,120
kWh
$681
-
kW-mo/yr
$(-400.0) $(-300.0) -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $108 $250 $30
1,042
kWh
$78
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $64,040 $45,767 $3,670
127,362
kWh
$21,695
-
kW-mo/yr
$(-400.0) $(-300.0) $39,375
TOTAL IMPLEMENTED $51,838 $21,935 $416
14,425
kWh
$12,747
-
kW-mo/yr
$(-400.0) $(-300.0) $39,375
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs