Assessment Year | 2005 |
---|---|
Principal Product | Rough cut lumber |
NAICS | 423310: Lumber, Plywood, Millwork, and Wood Panel Merchant Wholesalers |
SIC | 2420: |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
120,000
ft2
|
Annual Production | 11,000
thousand feet
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $35,042 | 1,525,200 |
kWh
|
$0.023 |
Electricity Demand | $99,521 | 12,063 |
kW-mo/yr
|
$8.25 |
Electricity Fees | $295 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $64,040 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $51,838 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.6192: Use a less expensive method of waste removal | $39,375 | $1,000 | - | - | - | - | $39,375 | |
02 | 2.3212: Optimize plant power factor | $11,668 | $20,000 | - |
$11,668
-
kW-mo/yr
|
- | - | - | |
03 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $10,275 | $18,500 |
$2,860
99,260
kWh
|
$7,415
-
kW-mo/yr
|
- | - | - | |
04 | 2.4151: Develop a repair/replace policy | $443 | $585 |
$123
4,263
kWh
|
$320
-
kW-mo/yr
|
- | - | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $1,927 | $5,332 |
$394
13,677
kWh
|
$1,533
-
kW-mo/yr
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $244 | $100 |
$263
9,120
kWh
|
$681
-
kW-mo/yr
|
$(-400.0) | $(-300.0) | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $108 | $250 |
$30
1,042
kWh
|
$78
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $64,040 | $45,767 |
$3,670
127,362
kWh
|
$21,695
-
kW-mo/yr
|
$(-400.0) | $(-300.0) | $39,375 | ||
TOTAL IMPLEMENTED | $51,838 | $21,935 |
$416
14,425
kWh
|
$12,747
-
kW-mo/yr
|
$(-400.0) | $(-300.0) | $39,375 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs