ITAC Assessment: MO0001
ITAC logo
ITAC Assessment: MO0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ANIMAL FEEDS
NAICS
n/a
SIC 2047: Dog and Cat Food
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area
n/a
Annual Production 30,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,106 3,216,882
kWh
LPG $120,621 43,876
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,693 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,315

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.5191: Modify dye beck $30,784 $16,000 $30,784
626,612
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,122 $2,500 $3,122
63,599
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,351 $900 - $2,351
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $1,805 $750 $1,805
36,635
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $375 $137 $375
7,620
kWh
-
06 2.1243: Use heat from boiler blowdown to preheat boiler feed water $256 $500 - $256
-
MMBtu
TOTAL RECOMMENDED $38,693 $20,787 $36,086
734,466
kWh
$2,607
-
MMBtu
TOTAL IMPLEMENTED $35,315 $17,787 $32,964
670,867
kWh
$2,351
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs