| Assessment Year | 1990 |
|---|---|
| Principal Product | ANIMAL FEEDS |
| NAICS |
n/a
|
| SIC | 2047: Dog and Cat Food |
| Sales Range | $10 M to 50M |
| # of Employees | 52 |
| Plant Area |
n/a
|
| Annual Production | 30,000
ton
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $158,106 | 3,216,882 |
kWh
|
$0.049 |
| LPG | $120,621 | 43,876 |
MMBtu
|
$2.75 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $38,693 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $35,315 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
|---|---|---|---|---|---|---|
| 01 | 2.5191: Modify dye beck | $30,784 | $16,000 |
$30,784
626,612
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,122 | $2,500 |
$3,122
63,599
kWh
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,351 | $900 | - |
$2,351
-
MMBtu
|
|
| 04 | 2.4221: Install compressor air intakes in coolest locations | $1,805 | $750 |
$1,805
36,635
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $375 | $137 |
$375
7,620
kWh
|
- | |
| 06 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $256 | $500 | - |
$256
-
MMBtu
|
|
| TOTAL RECOMMENDED | $38,693 | $20,787 |
$36,086
734,466
kWh
|
$2,607
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $35,315 | $17,787 |
$32,964
670,867
kWh
|
$2,351
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs