ITAC Assessment: WI0320
ITAC logo
ITAC Assessment: WI0320
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Medical Rehabilitation Products & Marine Buoys
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 330
Plant Area 195,000
ft2
Annual Production 1,050,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,594 5,492,087
kWh
Electricity Demand $84,415 11,499
kW-mo/yr
Electricity Fees $5,700 -
Natural Gas $40,102 8,066
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $112,506 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 4.423: Move product using mechanical means $98,187 $100,000 $(-1,310.0)
(-53,634)
kWh
$(-2,063.0)
-
kW-mo/yr
- $55,200 $46,360
02 2.7261: Install timers and/or thermostats $4,771 $600 - - $4,771
-
MMBtu
- -
03 2.7243: Improve air circulation with destratification fans / other methods $3,933 $6,400 $(-301.0)
(-12,309)
kWh
- $4,234
-
MMBtu
- -
04 2.7221: Lower temperature during the winter season and vice-versa $3,532 - - - $3,532
-
MMBtu
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,433 $7,000 $1,433
58,617
kWh
- - - -
06 2.4221: Install compressor air intakes in coolest locations $650 $740 $400
16,413
kWh
$250
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $112,506 $114,740 $222
9,087
kWh
$(-1,813.0)
-
kW-mo/yr
$12,537
-
MMBtu
$55,200 $46,360
TOTAL IMPLEMENTED $650 $740 $400
16,413
kWh
$250
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings